复合电缆桥架铺设要注意哪些?

文章来源://www.comprepyme.com/作者:电缆桥架厂家发布时间:2023-12-28浏览次数:1

返回: 公司新闻

复合电缆桥架铺设步骤:复合电缆桥架是一种用于电缆布线的支架系统,它由金属框架和复合材料制成,具有较高的强度和耐腐蚀性能。以下是济南复合电缆桥架铺设的一般步骤:

Steps for laying composite cable tray: Composite cable tray is a support system used for cable routing, made of metal frame and composite materials, with high strength and corrosion resistance. The following are the general steps for laying composite cable trays in Jinan:

设计规划:在进行复合电缆桥架铺设之前,需要进行详细的设计规划,包括确定所需的长度、规格和铺设方式等。

Design Planning: Before laying the composite cable tray, a detailed design plan is required, including determining the required length, specifications, and laying method.

材料准备:根据设计规划,准备好所需的复合电缆桥架材料,包括桥架、支撑件、连接件等。

20220522103505706.jpg

Material preparation: According to the design plan, prepare the required composite cable tray materials, including trays, supports, connectors, etc.

定位安装点:根据设计规划,在需要铺设电缆的位置进行定位,并使用标尺和标记工具进行标记。

Positioning installation points: According to the design plan, locate the locations where cables need to be laid and mark them using rulers and marking tools.

安装支撑架:首先安装支撑架,支撑架用于固定和支持复合电缆桥架系统。根据设计要求,在标记的位置固定支撑架,确保其稳固牢固。

Installation support frame: First, install the support frame, which is used to fix and support the composite cable tray system. According to the design requirements, fix the support bracket at the marked position to ensure its stability and firmness.

铺设复合电缆桥架:根据设计规划,将复合电缆桥架放置在支撑架上,并使用连接件将各个桥架连接起来,形成连续的通道。

Laying composite cable tray: According to the design plan, place the composite cable tray on the support frame and connect each tray with connectors to form a continuous channel.

固定和调整:在铺设过程中,确保复合电缆桥架的水平和垂直度,并使用固定件将其固定在支撑架上。

Fixation and adjustment: During the laying process, ensure the level and verticality of the composite cable tray, and use fixing components to fix it on the support frame.

安装配件:根据需要,安装各种配件,如弯头、横向连接器、垂直连接器等,以满足不同布线要求。

Installation accessories: Install various accessories as needed, such as elbows, horizontal connectors, vertical connectors, etc., to meet different wiring requirements.

检查和测试:完成铺设后,对复合电缆桥架进行检查,确保其安装牢固、无松动或变形,并进行必要的电缆拉线和测试工作。

Inspection and testing: After completion of laying, inspect the composite cable tray to ensure that it is installed firmly, without looseness or deformation, and carry out necessary cable pulling and testing work.